Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

6 unique locations (56 components)

Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (2 components)

15 MW Battery Storage facility located at Warwickshire.

Inactive • 2021-22 (T-4)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (2 components)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land North of Clayhill Farm Westoning MK45 5JD (9 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2018-19 (T-1), 2021-22 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (23 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
4.50 MW
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (5 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2018-19 (T-1), 2021-22 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
12.88 MW
Loading map...
Showing 6 locations