Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

9 unique locations (336 components)

AVENUE ROAD LONDON N14 (2 components)
• EV charging at residential premises
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2023-24 (T-1), 2018-19 (T-1)
0.61 MW
DY5 (50 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
79.23 MW
EH52 (65 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
112.86 MW
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. This CMU is adjacent …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS. See map. (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS. See map. (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2021-22 (T-4)
S42 (67 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
57.33 MW
SO22 (79 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
120.37 MW
WF8 (69 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
103.01 MW
Loading map...
Showing 9 locations