Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

6 unique locations (253 components)

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (60 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4371.10 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.43 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (27 components)
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
• Unit 4 Cruachan pump storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.88 MW
Loading map...
Showing 6 locations