Storage

272 unique locations (1297 components) - Page 1 of 11

35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.08 MW
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)

45MW/45MWh BESS

Active • 2026-27 (T-4)
5.32 MW
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Active • 2026-27 (T-4)
11.79 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.54 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.42 MW
Bengrove Farm, Base Lane, Sandhurst, Gloucestershire, GL2 9NU (1 component)

CMU ID 22BEN4, a new build battery storage CMU

Active • 2026-27 (T-4)
8.66 MW
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.53 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component)

60MW/60MWh BESS

Active • 2026-27 (T-4)
7.09 MW
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
53.16 MW
8.87 MW
Loading map...
Showing 25 locations