Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

5 unique locations (58 components)

46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW
Ardagh Glass, Portland Place, Irvine KA12 8JA (16 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build battery
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.19 MW
Asda Rawtenstall, Lower Mill St. Mary's Way BB4 8EL (7 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.98 MW
Asda Thurnscoe, 144 Houghton Road Thurnscoe, Barnsley, S630JZ (11 components)
• Battery Storage Facilty
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Westexe, Tiverton, Devon, EX16 5LL (8 components)
• 2026 kW CHP unit
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
7.31 MW
Loading map...
Showing 5 locations