Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

24 unique locations (250 components)

2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (9 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
33 Oxford Road Yeovil BA21 5HR (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4)
350 Petre Street Sheffield S4 8LU (16 components)
• New build battery
• New build battery.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Amersham Road Denham Buckinghamshire SL9 7AW (10 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Barnfield Road Swindon SN2 2DJ (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (9 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Camilla Farm, Auchtertool, Kircaldy, Fife, KY2 5XW (2 components)
• Battery storage facility with 49.950MW interconnected capacity for both export and import
• Battery storage facility with 49MW interconnected capacity for both export and import
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Generating Unit 1
• Generating Unit 2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
204.51 MW
Hill Farm Spring Lane Packington Ashby de la Zouch Leicestershire LE65 1WU (5 components)
• The 9.8MW CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries.
• The CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 8MW.
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (13 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Little Holt, Holt Lane, Hook RG27 9ER (11 components)
• 5MW battery energy storage facility at Little Holt, Holt Lane, Hook
• 6MW battery energy storage facility at Little Holt, Holt Lane, Hook
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Lochawe, Dalmally. Argyll. PA33 1AN. Scotland (16 components)
• Cruachan pump storage hydro plant - Unit 3
• Cruachan pump storage hydro plant - Unit 4
• Cruachan pumped storage hydro plant - Unit 2
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
121.05 MW
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (16 components)
• Battery Storage facility
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (16 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Nunhide Lane Theale Berkshire RG31 7SD (4 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (10 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
48.05 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Transport Yard, Parsonage Street, Oldbury, B69 4PH (6 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (12 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (5 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (13 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 24 locations