Storage

34 unique locations (345 components) - Page 1 of 2

Albion Road, Dartford, Kent, DA1 5PZ (17 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Amersham Road Denham Buckinghamshire SL9 7AW (10 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (9 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Boundary Street, Wigan WN1 3AP (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Breck Road, Wallasey, Liverpool (5 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation.

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (6 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (8 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (6 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (13 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (5 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Lookabootye Broxburn West Lothian EH52 5PD (13 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (8 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (5 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (6 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lower Road, Brentwood, CM13 1BZ (3 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Milton Court Farm, Dorking, RH4 3LY (16 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (9 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
8.54 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (10 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...