Storage (Duration 9h)

33 unique locations (288 components) - Page 1 of 2

Active MW: 17924.36 MW
Inactive MW: 0.00 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 OX44
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.55 MW
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.55 MW
Deeside Power Station, Zone 4 Weybridge Road, Deeside Industrial Park, Flintshire, CH5 2UL (3 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Active • 2028-29 (T-4), 2026-27 (T-1)
100.29 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (18 components)
• Generating Unit 1
• Generating Unit 2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1128.57 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (3 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active • 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
• CMU ID 22KIN4, a new build battery storage CMU
• CMU ID 23KIN4, a new build battery storage CMU
Storage (Duration 2h) Storage (Duration 9h) TALSIE CROWN BESS LIMITED New Build Generating CMU Kings Lynn Kings Lynn Not Prequalified PE14
Active • 2027-28 (T-4), 2026-27 (T-4)
32.75 MW
Land At Drum Farm Keith Moray AB55 5NP (1 component)

Battery storage CMU

Storage (Duration 9h) FIELD DRUM FARM LTD New Build Generating CMU Drum Farm AB55
Active • 2027-28 (T-4)
9.06 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (3 components)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
32.25 MW
Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT (1 component)

Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …

Storage (Duration 9h) ROCHDALE (BES) LTD New Build Generating CMU Rochdale OL11
Active • 2027-28 (T-4)
8.82 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
47.33 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2027-28 (T-4), 2026-27 (T-4) ...
47.33 MW
39.48 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP Pivot Power Bredbury Pivot Power Bredbury +2 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.48 MW
Land on the north side of Hickling Lane, Dunston, Norwich, NR14 8PW (4 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note this is a multi-unit site, comprising a battery (PPNY25) and a solar unit (BLOG25). When commissioned, both units will be metered separately and have individual BMU IDs. The connection capacities for the battery and the solar units have been defined to comply with rule 3.5.1A and to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2027-28 (T-4), 2026-27 (T-1)
43.86 MW
Land To East Of Holmston Roundabout A77T From Whitletts Roundabout To Holmston Roundabout, Ayr, South Ayrshire (1 component) Geocoding Needed

Battery storage CMU

Storage (Duration 9h) FIELD HOLMSTON LTD New Build Generating CMU Holmston
Active • 2027-28 (T-4)
9.06 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.32 MW
16.32 MW
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Loading map...
Showing 25 locations