Storage (Duration 8h)

7 unique locations (103 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land to the north of Chickerell National Grid substation, directly south of Coldharbour, DT3 4BG (2 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 8h) CHICKERELL STORAGE LIMITED New Build Generating CMU Chickerell Storage Limited Not Prequalified DT3
Active β€’ 2029-30 (T-4), 2027-28 (T-4)
149.33 MW
Land off Saundercroft Road, Broadclyst, Devon, EX5 2PF (2 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 8h) EXETER STORAGE LIMITED New Build Generating CMU Exeter Storage Limited EX5
Active β€’ 2029-30 (T-4), 2027-28 (T-4)
108.26 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (3 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 5h) Storage (Duration 8h) EAST CLAYDON STORAGE LIMITED New Build Generating CMU East Claydon Storage Limited East Claydon Storage Limited Not Prequalified MK18
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
291.34 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (7 components)
β€’ 40MW battery storage located near to the Coalburn North 400kV substation.
β€’ 50MW battery storage located near Coalburn North 400kV substation.
β€’ 50MW battery storage located near to the Coalburn North 400kV substation.
Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h) ZENOBE COALBURN LIMITED New Build Generating CMU Coalburn unit 1 Coalburn unit 2 ML11
Active β€’ 2028-29 (T-4), 2027-28 (T-4)
145.79 MW
Land at Somerford Farm, SN16 9RN (4 components)
β€’ A Battery Energy Storage System
β€’ A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 8h) PD813ETY LTD PD688IRO LTD New Build Generating CMU Minety 3 Minety 3 +2 more SN16
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
β€’ BM Unit T_DINO-1 at Dinorwig Power Station
β€’ BM Unit T_DINO-2 at Dinorwig Power Station
β€’ BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW