Storage (Duration 6h)

3 unique locations (71 components)

Active MW: 15220.84 MW
Inactive MW: 0.00 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components) Geocoding Needed

New build BESS to be installed within a future Greener Grid Park.

Active β€’ 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (67 components) Geocoding Needed
β€’ BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
β€’ BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
β€’ BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
15096.44 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components) Geocoding Needed
β€’ The CRYOBattery? is the world?s first commercial-scale Cryogenic Energy Storage system. The technology uses surplus electricity to condense atmospheric air into a liquid. The CRYOBattery? has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
β€’ The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense atmospheric air into a liquid. The project has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
Active β€’ 2028-29 (T-4), 2025-26 (T-4)
78.48 MW
Loading map...
Showing 3 locations