Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 5h)

10 unique locations (59 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
13.77 MW
Thame Lane, Culham, Clifton Hampden, South Oxfordshire, Oxfordshire, England, OX14 3ES (2 components)

Battery Storage Plant

Storage (Duration 5h) CULHAM STORAGE LIMITED New Build Generating CMU Culham Storage Limited Not Prequalified OX14
Active • 2029-30 (T-4), 2028-29 (T-4)
214.86 MW
Luton Road, Chalton, Fancott, Toddington, Central Bedfordshire, England, LU5 6HT (2 components)

Battery Storage Plant

Storage (Duration 5h) Storage (Duration 8h) SUNDON STORAGE LIMITED New Build Generating CMU Sundon Storage Limited Not Prequalified LU5
Active • 2029-30 (T-4), 2028-29 (T-4)
214.39 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (3 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 5h) Storage (Duration 8h) EAST CLAYDON STORAGE LIMITED New Build Generating CMU East Claydon Storage Limited East Claydon Storage Limited Not Prequalified MK18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
291.34 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (7 components)
• A 47.380 MW component of a 350 MW new-build Battery Storage Site.
• A 47.380 component of a 350 MW new-build Battery Storage Site.
• An 87.500 MW Battery Storage Site Component.
Active • 2029-30 (T-4), 2028-29 (T-4)
133.50 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2029-30, 2027-28 ...
488.49 MW
Loading map...
Showing 10 locations