Storage (Duration 5h)

13 unique locations (45 components)

Land to Far Souracre, SK15 3DA (2 components)

Lithium ion battery storage plant

Active • 2028-29 (T-4)
31.40 MW
181.63 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
• Solar T70 Based CHP System
Active • 2028-29 (T-4), 2022-23 (T-4)
41.87 MW
83.74 MW
83.74 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (6 components)
• A Battery Energy Storage System.
• to be confirmed once the CMU components are known
Active • 2028-29 (T-4), 2026-27 (T-4) ...
140.24 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (2 components)
• A Battery Energy Storage System.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-4)
24.86 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (2 components)
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Active • 2028-29 (T-4), 2023-24 (T-4)
24.86 MW
Land adjacent Minety National Grid Substation. B4040, Nr Malmesbury, Wiltshire, SN16 9DX (2 components)
• A Battery Energy Storage System.
• A New Build Transmission Connected Battery Energy Storage System.
Active • 2028-29 (T-4)
49.72 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
Loading map...
Showing 13 locations