Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

85 unique locations (384 components) - Page 1 of 4

West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (6 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
12.16 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
• 2.6MW of demand reduction
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-1), 2023-24 (T-4)
0.09 MW
Water Pumping Station, Watson Road, MK42 6BL (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Unproven DSR yet to be procured
Active • 2024-25 (T-1), 2021-22 (T-4)
14.00 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (4 components)
• A gas engine CHP site providing hot water to a local district heating network
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (2 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
10.44 MW
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.31 MW
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (11 components)
• Energy facility comprising of reciprocating engine sets.
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Active • 2028-29 (T-4), 2020-21 (T-4)
584.36 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (5 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2025-26 (T-1)
55.01 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.62 MW
Stephenson Road, Colchester Business Park, CO4 9QP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW
Station Rd, Clowne, Chesterfield S43 4AB (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (2 components)

New Build Storage Facility

Active • 2028-29 (T-4)
75.13 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (4 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
729.20 MW
Selby, North Yorkshire, YO8 6PG (3 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.48 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (3 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
50.09 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Rear Grazing Land, Crescent Industrial Estate, Station Road, Southampton, Hampshire, SO16 0YD (4 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2024-25 (T-1), 2023-24 (T-4) ...
18.89 MW
Loading map...
Showing 25 locations