Storage (Duration 4h)

11 unique locations (95 components)

Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (4 components)
• A gas engine CHP site providing hot water to a local district heating network
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
41.27 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
land adjacent to the AYRSHIRE GRID 400KV SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
• A reciprocating gas engine CHP providing hot water to a local heating network
• Lithium ion battery storage plant
• This CMU is formed of a battery bank and PCS capable of providing 15MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's South West England region.
Active • 2026-27 (T-4), 2021-22 (T-4)
9.17 MW
land adjacent to the AYRSHIRE GRID 400 KV SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (5 components)
• Lithium ion battery storage plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• Two 1.2MW caterpillar generators
Active • 2026-27 (T-4), 2021-22 (T-4) ...
22.93 MW
land adjacent to the AYRSHIRE GRID 400KV COLLECTOR SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW
• Lithium ion battery storage plant
• Paper Mill carrying out DSR using load turn-down.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.69 MW
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (3 components)

12 MW Connection 48 MWh Distribution unit

Active • 2026-27 (T-4), 2023-24 (T-1)
20.46 MW
adjacent to Kilmarnock South Substation KA1 3TN (10 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Lithium ion battery storage plant
• To be confirmed once components are known
Active • 2026-27 (T-4), 2025-26 (T-1) ...
107.51 MW