Storage (Duration 4h)

32 unique locations (252 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
adjacent to Kilmarnock South Substation KA1 3TN (14 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available., Please see the cover letter for more details. (5 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4), 2024-25 (T-1)
39.67 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit

Storage (Duration 4h) DRAGONS LANE BATTERY STORAGE LIMITED New Build Generating CMU Dragon Lane CW11
Active • 2026-27 (T-4), 2023-24 (T-1)
12.98 MW
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a Greener Grids Park
Active • 2029-30 (T-4), 2028-29 (T-4) ...
85.72 MW
Eccles Birgham Farm, TD12 4LU (16 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 1 Kilmarnock South unit 2 TD12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
326.52 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.30 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2026-27 (T-1) ...
0.25 MW
Netherton Farm, Keith AB55 5PE (16 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2029-30 (T-4), 2026-27 (T-4) ...
194.43 MW
Newton Farm Newton South Queensferry West Lothian, It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post code is available. (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import
• Solar photovoltaic generation scheme connected to the distribution network
• bess photovoltaic generation scheme connected to the distribution network (33kV). 29.9MW export and 20MW import
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (5 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.11 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (7 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
308.46 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Loading map...
Showing 25 locations