Storage (Duration 3h)

1 unique locations (6 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
β€’ 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
β€’ 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
β€’ BESS project to be installed within a Greener Grids Park
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...