Storage (Duration 3h)

3 unique locations (17 components)

Active MW: 702.22 MW
Inactive MW: 0.00 MW
Minchens Lane, Bramley, TADLEY RG26 5BJ (6 components)

99MW of Battery Energy Storage Systems

Storage (Duration 3h) Storage (Duration 2.5h) PENSO POWER LIMITED New Build Generating CMU Not Prequalified RG26
Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.58 MW
Minchens Lane, Bramley, Tadley, RG26 5BJ (6 components)
• 99.000MW Battery Energy Storage site
• 99MW of Battery Energy Storage Systems
• Existing, Operational Battery Energy Storage site. This application is for a built, installed, commissioned and operational battery storage facility, with civil works, power conversion units, battery cells house in containers, transformers, cabling and associated wiring and ancillary equipment relevant for the operation of an energy storage system. The plant is connected to the 132kv network via appropriate equipment, cabling and substation designed and built to meet the relevant DNO requirements.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.58 MW
Minchens Lane Bramley Tadley RG26 5BJ (5 components)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.58 MW
Loading map...
Showing 3 locations