Storage (Duration 3h)

3 unique locations (8 components)

School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
3.42 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
Loading map...
Showing 3 locations