Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

113 unique locations (504 components) - Page 2 of 5

Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component)

A Distribution Connected Battery Energy Storage System

Not Prequalified SG7
Inactive •
10.37 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Not Prequalified KY14
Inactive •
13.61 MW
Netherton Farm, Keith AB55 5PE (3 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Inactive •
54.30 MW
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (2 components)

New-Build Li-Ion BESS, 2hr duration.

Inactive •
2.09 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (6 components)
• New build battery storage
• New build generating storage unit
HX5
Inactive •
66.79 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Rejected DY13
Inactive •
41.46 MW
Link Road, Launceston, Cornwall, PL15 9LP England (8 components)
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Inactive •
5.13 MW
Latteridge Lane, Iron Acton, Tytherington, South Gloucestershire, West of England, England, BS35 3TF (2 components)

A Distribution Connected Battery Energy Storage System

Inactive •
20.73 MW
Lark's Lane, Iron Acton, Latteridge, South Gloucestershire, West of England, England, BS37 9TX (1 component)

A Distribution Connected Battery Energy Storage System.

Inactive •
20.94 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Not Prequalified BL5
Inactive •
6.28 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Rejected NG11
Inactive •
41.84 MW
15.17 MW
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

BL5
Inactive •
14.51 MW
Land to the south of National Grid's Rainhill substation, Lea Green Road, Rainhill WA9 4QD (2 components)

Battery project on greenfield site

WA9
Inactive •
30.95 MW
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.

Rejected NR14
Inactive •
22.20 MW
Land to the north of East Howle Farm Ferryhill DL17 8SA (1 component)

2 hour containerised battery storage

Inactive •
13.82 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (3 components)

New Build Battery Energy Storage system

Inactive •
15.50 MW
Land to North of Wey Manor Road, Addlestone, New Haw Surrey, KT15 3JR (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive •
23.87 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (1 component)

This is a 49.99MW battery storage facility connected at 33kV.

KY6
Inactive •
13.16 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (2 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Rejected WF1
Inactive •
33.46 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component)

New build generating battery storage unit

Not Prequalified SS11
Inactive •
83.76 MW
Land South of Staythorpe Road, Staythorpe, NG23 5RG (1 component)

New build battery storage

Inactive •
37.69 MW
Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT (2 components)

New build generating storage asset

Not Prequalified EH32
Inactive •
20.94 MW
Land South of Barnhill Road, Macduff, Aberdeenshire, Scotland, AB44 1XY, United Kingdom, (2 components)

New build battery storage

Not Prequalified AB44
Inactive •
10.09 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component)

A 30MW Distribution Connected Battery Energy Storage System

Not Prequalified M35
Inactive •
6.28 MW
Loading map...
Showing 25 locations