Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

321 unique locations (1311 components) - Page 10 of 13

Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (7 components)

Battery energy storage unit

Not Prequalified DE75
Inactive •
8.37 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (11 components)
Rejected
Inactive •
Land At Bishops Bowl Fishery Stratford-upon-Avon CV47 2SR (11 components)

Battery energy storage unit

Inactive •
12.36 MW
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP (2 components)
Not Prequalified
Inactive •
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (6 components)
• New Build Battery Storage
• New build battery storage
Inactive •
167.25 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (3 components)
Not Prequalified
Inactive •
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (5 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified ST9
Inactive •
70.04 MW
Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW (1 component)

The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

ST6
Inactive •
10.45 MW
Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG (3 components)

New Build CMU comprising of battery storage and associated plant

TA4
Inactive •
24.18 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (2 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified SN12
Inactive •
8.16 MW
Land adjacent to Berryburn Substation Moray (2 components)
Inactive •
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (3 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified OL16
Inactive •
13.54 MW
Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL (1 component)

2 hour Battery Energy Storage System

DD8
Inactive •
4.36 MW
Land 300M NE Of Bridge Of Dun Substation Dun Montrose (2 components)

2 hour containerised battery storage

Not Prequalified
Inactive •
7.41 MW
Kintore, Inverurie, Aberdeenshire, AB51 0XY (4 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified AB51
Inactive •
29.48 MW
Loading map...
Showing 25 locations