Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

2 unique locations (3 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
β€’ The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
β€’ The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Salisbury BESS Salisbury BESS SP2
Active β€’ 2025-26 (T-4), 2024-25 (T-1)
9.98 MW
Land adjacent to Salisbury Substation, Salisbury, SP2 0BL (1 component)

49.5MW Battery Energy Storage System

Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Not Prequalified SP2
Active β€’ 2024-25 (T-4)
Loading map...
Showing 2 locations