Storage (Duration 2h)

2 unique locations (7 components)

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, South Gloucestershire, BS37 9TX (5 components)
• A 25MW Battery Energy Storage System.
• A 47.5MW Battery Energy Storage System.
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 2.5h) HD000ACT LTD New Build Generating CMU Fairholme Minety BS37
Active • 2029-30 (T-4), 2027-28 (T-4) ...
37.53 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (2 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Iron Acton Iron Acton 2 Rejected BS37
Active • 2027-28 (T-4), 2024-25 (T-4)
10.79 MW