Storage (Duration 2h)

2 unique locations (2 components)

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land Adjacent Unit 66, Gravelly Industrial Park, Walker Dr, Birmingham, B24 9AW (1 component)

The CMU is a new build 50MW/100MWh battery storage facility connected to the Western Power distribution network at 33kV, located at the Gravelly Industrial Park, Birmingham.

Active • 2026-27 (T-4)
11.58 MW