Storage (Duration 2h)

2 unique locations (14 components)

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Plot C, Land at Severn Road Avonmouth BS10 7SE (7 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Storage (Duration 1h) Storage (Duration 2h) FPC (Ipswich) Limited New Build Generating CMU Avonmouth B1 Avonmouth B2 +1 more Not Prequalified BS10
Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.31 MW
Plot C Land at Severn Road Avonmouth BS10 7SE (7 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Storage (Duration 1h) Storage (Duration 2h) Voltalia UK Ltd New Build Generating CMU Severn Road Severn Road 5 +2 more BS10
Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.31 MW
Loading map...
Showing 2 locations