Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

1 unique locations (7 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Plot C Land at Severn Road Avonmouth BS10 7SE (7 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Storage (Duration 1h) Storage (Duration 2h) Voltalia UK Ltd New Build Generating CMU Severn Road Severn Road 5 +2 more BS10
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
27.31 MW
Loading map...
Showing 1 locations