Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
Welkin Road, Bredbury, SK6 2BH (6 components)
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (3 components)
Battery Storage (2)
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 component)
A 2 hour BESS connecting directly to the DNO network.
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
Smithyard Lane, Watchet, TA4 4NN (2 components)
New Build CMU comprising of battery storage and associated plant
Royle Barn Road, Rochdale, OL11 3DX (5 components)
Battery Energy Storage Site
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
Pikevy Farm, Glenrothes, Fife, KY6 3HD (3 components)
This is a 49.9MW battery storage facility connected at 33kV.
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (3 components)
This CMU component represents the BESS system of a co-located (solar and storage) site
Overhill Farm, Rothienorman, Scotland, AB51 8YN (3 components)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)
30MW/30MWh one hour battery
Land west of Roman Camp Road, Calderwood, Broxburn, West Lothian, EH52 5PF (3 components)
Standalone battery storage system connecting at 33kV to the Broxburn substation
Land To The West Of Meardsall Lane, Swinderby, North Kesteven, LN6 9JA (1 component)
A standalone 2 hour BESS connecting directly onto the DNO network.
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (1 component)
A 2 hour BESS connecting directly to the DNO network.
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components)
Land To The North Of Folly Road, Deanshanger, MK19 6EY (1 component)
A 2 hour BESS connecting directly to the DNO network.
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)
This is a 49.99MW battery storage facility connected at 33kV.
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)
Lithium-based battery energy storage system.
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)