Storage (Duration 2h)

69 unique locations (230 components) - Page 1 of 3

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (WINCHESTER) LIMITED New Build Generating CMU Winchester Winchester +2 more SO21
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.26 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Storage (Duration 2h) FIELD NEWPORT LTD New Build Generating CMU Field Newport Field Newport +2 more NP19
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.04 MW
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (3 components)

Battery Storage (2)

Active • 2027-28 (T-4), 2026-27 (T-1) ...
6.20 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
32.54 MW
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (SWINDON) LIMITED New Build Generating CMU Swindon Swindon +2 more SN3
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.59 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Waterswallows BESS Waterswallows BESS SK17
Active • 2025-26 (T-1), 2024-25 (T-1)
6.34 MW
Smithyard Lane, Watchet, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA4
Active • 2026-27 (T-1), 2025-26 (T-1)
7.16 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (3 components)

This is a 49.9MW battery storage facility connected at 33kV.

Active • 2027-28 (T-4), 2026-27 (T-1) ...
33.58 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Shaftesbury BESS Shaftesbury BESS SP8
Active • 2027-28 (T-4), 2026-27 (T-1) ...
12.08 MW
Overhill Farm, Rothienorman, Scotland, AB51 8YN (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
• New build 2-hour Battery storage site
Active • 2027-28 (T-4), 2026-27 (T-1) ...
37.73 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.98 MW
18.49 MW
Land west of Roman Camp Road, Calderwood, Broxburn, West Lothian, EH52 5PF (3 components)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Active • 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
Land To The West Of Meardsall Lane, Swinderby, North Kesteven, LN6 9JA (1 component)

A standalone 2 hour BESS connecting directly onto the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED Power Pod 3 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HEIT HP LIMITED New Build Generating CMU Hawthorn Pit Hawthorn Pit BESS +2 more SR7
Active • 2026-27 (T-4), 2025-26 (T-1) ...
46.36 MW
Land To The North Of Folly Road, Deanshanger, MK19 6EY (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified MK19
Active • 2025-26 (T-1)
0.26 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV.

Storage (Duration 2h) Storage (Duration 1.5h) ROARING HILL ENERGY STORAGE LTD New Build Generating CMU Roaring Hill Roaring Hill +1 more KY6
Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.35 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)
• 47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.
• Battery energy storage site with 47.5MW capacity located at Indian Queens substation.
Storage (Duration 2h) Storage (Duration 1.5h) SAMBAR POWER LIMITED New Build Generating CMU Indian Queens BESS Indian Queens BESS 1 PL26
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.30 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system.

Storage (Duration 2h) Storage (Duration 1.5h) WALPOLE GREEN LIMITED New Build Generating CMU Walpole Walpole +1 more PE14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.70 MW
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)

Standalone Battery Storage Asset

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-4) ...
38.53 MW
Loading map...
Showing 25 locations