Storage (Duration 2h)

154 unique locations (647 components) - Page 1 of 7

Active MW: 0.00 MW
Inactive MW: 0.00 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2029-30, 2027-28 ...
488.49 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26, 2024-25 ...
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26, 2024-25 ...
22.86 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.65 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Abbey Not Prequalified GL7
Active • 2025-26 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (14 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected SO41
Active • 2025-26 (T-1)
0.26 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.74 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2026-27 (T-1) ...
12.96 MW
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Beeston Not Prequalified SK6
Active • 2025-26 (T-4)
Birch Road, Colchester CO2 0EJ (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2026-27 (T-1) ...
16.81 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.11 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System.

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 1 HP27
Active • 2025-26 (T-1)
12.73 MW
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 2 HP27
Active • 2025-26 (T-1)
12.73 MW
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Cartridge Not Prequalified SN15
Active • 2025-26 (T-4)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.21 MW
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Chinley Farm Not Prequalified SK23
Active • 2025-26 (T-4)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Loading map...