Storage (Duration 2h)

55 unique locations (318 components) - Page 1 of 3

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-4) ...
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
Reciprocating engines Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power Not Prequalified PR26
Active • 2025-26 (T-4), 2024-25 (T-4) ...
135 CLYDESDALE PLACE, MOSS SIDE INDUSTRIAL ESTATE, LEYLAND, PR26 7QS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Reciprocating engines Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED Glowhouse Power Glowhouse Power Not Prequalified PR26
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
22.86 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.21 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
• A transmission connected battery storage unit
• A transmission connected solar park.
Solar Photovoltaic Storage (Duration 2h) CLEVE HILL SOLAR PARK LIMITED New Build Generating CMU Cleve Hill A Cleve Hill B +1 more Not Prequalified CT5
Active • 2024-25 (T-4)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (12 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.76 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land adjacent to Salisbury Substation, Salisbury, SP2 0BL (1 component)

49.5MW Battery Energy Storage System

Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Not Prequalified SP2
Active • 2024-25 (T-4)
LAND ADJOINING BATES ROAD, QUAYSIDE INDUSTRIAL ESTATE, MALDON, CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD, POTTERS BAR, EN6 3JF (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (8 components)
• A battery energy storage system
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2029-30 (T-4), 2025-26 (T-4) ...
9.44 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BF LIMITED New Build Generating CMU BUMPERS BUMPERS +7 more HP27
Active • 2026-27 (T-4), 2025-26 (T-4) ...
65.35 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Reciprocating engines Storage (Duration 2h) HD888CAP LIMITED New Build Generating CMU CAPENHURST CAPENHURST +2 more CH66
Active • 2025-26 (T-4), 2024-25 (T-4) ...
12.92 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
28.86 MW
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (3 components)
Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED Letchworth Power Not Prequalified SG6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.20 MW
LAND AT DUNHAMS LANE, LETCHWORTH GARDEN CITY, SG6 1JH (3 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED Letchworth Power Not Prequalified SG6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.20 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.46 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (2 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Iron Acton Iron Acton 2 Rejected BS37
Active • 2027-28 (T-4), 2024-25 (T-4)
10.79 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System
• A gas fuelled generating station.
Reciprocating engines Storage (Duration 2h) HD639LEG LIMITED New Build Generating CMU Fryston Legacy +1 more LL14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Reciprocating engines Storage (Duration 2h) HD777FRY LTD New Build Generating CMU Fryston Fryston +1 more LS25
Active • 2025-26 (T-4), 2024-25 (T-4)
Loading map...
Showing 25 locations