Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

24 unique locations (99 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Storage (Duration 2h) Zenobe Brindley Limited New Build Generating CMU Brindley_21 Brindley_21 +1 more SN2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.16 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (2 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

Storage (Duration 2h) AVILS CONSULTING LIMITED New Build Generating CMU Rejected BS11
Active • 2026-27 (T-4), 2023-24 (T-1)
6.05 MW
Smithyard Lane, Williton, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Watchet Watchet Not Prequalified TA4
Active • 2026-27 (T-4), 2023-24 (T-1)
7.88 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.89 MW
Pleasance Road - Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (6 components)

Battery storage plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.21 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active • 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Mannington Depot, Mannington Depot Service Road Mannington, Swindon SN5 8BA (3 components)

A Battery Energy Storage System.

Storage (Duration 2h) SW MANNINGTON LIMITED Mannington Mannington +1 more SN5
Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.29 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (12 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.74 MW
Land on the South Side of Fairy Lane, Sale, M33 2JU (7 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.41 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Inactive • 2023-24 (T-1)
16.66 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components) Geocoding Needed

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Storage (Duration 2h) FRASERBURGH ENERGY LTD New Build Generating CMU Not Prequalified
Active • 2026-27 (T-4), 2023-24 (T-1)
13.31 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Inactive • 2023-24 (T-1)
16.66 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Storage (Duration 2h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw +1 more ML2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.82 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire, BD15 0BZ (3 components)

New build battery storage.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (1 component)

A new build 20MW battery energy storage system

Storage (Duration 2h) HARMONY FM LIMITED New Build Generating CMU Farnham ESS GU10
Inactive • 2023-24 (T-1)
7.40 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility

Active • 2026-27 (T-4), 2025-26 (T-1) ...
39.88 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Loading map...
Showing 24 locations