Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 1h)

78 unique locations (270 components) - Page 1 of 4

Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2020-21 (T-4), 2019-20 (T-1)
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)

Storage facility

Inactive • 2022-23 (T-1)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Roundswell Business Park, Barnstable, Devon EX31 3TD (1 component)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• A Battery Energy Storage System (2)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Perseverance Road, Hereford, UK, HR4 9SE (1 component)

A 8MW New Build Battery Storage Site

Inactive • 2022-23 (T-4)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (2 components)
• A 20MW New Build Battery Storage Site
• A 40MW New Build Battery Storage Site
Inactive • 2022-23 (T-4)
Milton Court Farm, Dorking, RH4 3LY (6 components)
• 6MW battery energy storage facility at Milton Court Farm, Dorking (2)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)

20.000 MW of battery storage located at Lascar Works

Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations