Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 1h)

296 unique locations (1304 components) - Page 1 of 12

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Whitelee Windfarm Extension, East Ayrshire, KA16 9LE (1 component)

1 x 50MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
5.91 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.20 MW
Welkin Road, Portwood, Stockport, SK6 2BH (1 component)

Battery Energy Storage System

Active • 2025-26 (T-4)
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.64 MW
Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Active • 2024-25 (T-4)
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Active • 2025-26 (T-4)
Tickhill Road, Maltby, S66 7QR (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (3 components)

1.200MW BESS (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.14 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations