Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)
New build one-hour duration storage to replace diesel plant (2)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)
A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)
A Battery Energy Storage System (3)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)
New Battery Storage Site comprising brand new batteries & inverters
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)
A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (3)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (2 components)
6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt (2)
Galaxy Business Park Blaydon-on-Tyne NE21 4NT (1 component)
A 99.8MW battery storage system comprising approx 13 battery skid units at Galaxy Business Park
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)
99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England
Forest Lane, Alne, York, YO61 1TU (1 component)
1x 2.000MW 1 hour Energy Storage System
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)
49.99MW Lithium-ion Energy Storage System (3)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)
49.900MW one-hour duration battery energy storage facility. (3)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)
Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)
Feddal Battery Storage System, Feddal Estate, Dunblane, FK15 9RD (1 component)
9.999MW/9.999MWh greenfield BESS located approximately 3km West of Braco village, Dunblane, Scotland
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)
New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)
Faraday Road, Plymouth, PL4 0SR (2 components)
New build one-hour duration storage to replace diesel plant (2)
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 component)
30.000 MW standalone battery energy storage project
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)
New build one-hour duration storage to replace diesel plant (2)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)
Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)
49MW/49MWh BESS
Doncaster Power 16MW Ltd, Balby Carr Bank, J3 Business Park, Doncaster, DN4 8DE (1 component)
Battery Storage system with a duration of 1 hour
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)
1 x 30MW Lithium-ion battery with duration of 1 hour
Derehams Lane, Loudwater, High Wycombe, HP10 9RW (1 component)
40 MW/40MWh BESS located on an existing farm in Buckinghamshire, England