Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

Search Guide

This registry provides comprehensive search capabilities across all Capacity Market components:

  • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
  • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
  • CMU ID Search: Enter a specific CMU ID to find exact components
  • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

The search is intelligent and will try to determine what you're looking for based on your query.

You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

Understanding Auctions

The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

  • T-4 auctions: Held 4 years ahead of the delivery year
  • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

Search Results

Search results are grouped by location and show important details about each component:

  • Active Components with auction years 2024-25 or later
  • In-Active Components with only auction years before 2024-25
  • Company Name Click to view all components for this company
  • Technology Click to search for this technology type
  • CMU: XXX Click to search for this CMU ID
  • Auction Year Click to view details for this specific auction

Each result shows the component's capacity, location details, and participation in specific auction years.

You can sort results by relevance, location, or date using the sort options.

Pagination controls appear at the bottom when there are multiple pages of results.

Component Grouping

Components at the same location with the same description are grouped together to reduce duplication.

Each group shows:

  • All CMU IDs for components at that location
  • All auction years, sorted with newest first
  • An Active/Inactive status based on auction years

Grouping helps identify multi-year contracts and related components at the same site.

The total capacity shown combines all components in the group.

Components can be expanded to show individual details by clicking the expand icon.

Sorting and Filtering

You can sort search results by:

  • Relevance: Most relevant matches first
  • Location: Alphabetical order by location name
  • Date: By auction year (newest or oldest first)
  • Capacity: Highest or lowest capacity first

Click the column headers to change sort order.

You can filter results using the search refinements at the top of the results page:

  • Filter by technology type (e.g., only show batteries)
  • Filter by active status (show only active or inactive components)
  • Filter by auction year (show only components from specific auctions)

Map Explorer & Map View

We provide two map-based tools for exploring capacity market data:

Map Explorer

The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

  • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
  • Advanced Filtering: Filter by technology type, company, delivery year, and active status
  • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
  • Full-Screen Map: Maximizes map space for detailed geographical analysis
Search Map View

The Search Map View combines search functionality with map visualization, offering:

  • Search-First Approach: Start with text searches, then visualize results on the map
  • Integrated Results: Search results and map display work together
  • Performance Optimized: Streamlined for fast search result mapping

Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

Map Features:
  • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
    GasDSRNuclearCHPSolarWind
    BatteryBiomassHydroInterconnectorCoalOther
  • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
  • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
  • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
  • Interactive Markers: Click on individual markers to see detailed information about components at that location

Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

Contact Us

We're here to help with any questions about the Capacity Market Registry.

Email

For general inquiries and support:

For LLMs

Complete programmatic access guide for LLMs:

Loading...
Loading...
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Storage (Duration 1h)

    220 unique locations (1115 components) - Page 4 of 9

    All
  • Active
  • Inactive
  • Sort by: A-Z Components MW Date
    Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ(5 components)

    The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (3)

    BatteryStorageStorage (Duration 1h)GHEB2 C1 LimitedGL54
    Active • 2024-25 (T-4), 2023-24 (T-4) ...
    Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY(4 components)
    • New build one-hour duration storage to replace diesel plant (2)
    • New build two-hour duration storage to replace diesel plant
    BatteryStorage (Duration 1h)Storage (Duration 2h)PULSE CLEAN ENERGY UK LIMITEDCF44
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    4.32 MW
    Maidenhead Road, Windsor, SL4 5GD(8 components)
    • Battery storage (2)
    • Battery strorage unit
    BatteryStorage (Duration 1h)CENTRICA BUSINESS SOLUTIONS UK LIMITEDSL4
    Active • 2024-25 (T-4), 2023-24 (T-4) ...
    Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU(6 components)
    • New build 1.5 hour duration battery storage
    • New build one-hour duration storage
    BatteryStorage (Duration 1h)Storage (Duration 1.5h)GFV-2 LIMITEDCF38
    Active • 2026-27 (T-4), 2025-26 (T-4)
    4.27 MW
    Lower Dunton Road, Upminster, RM14 3TD(1 component)

    New battery storage project

    BatteryStorage (Duration 1h)BASILDON BESS LIMITEDRM14
    Active • 2025-26 (T-4)
    Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD(5 components)

    Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

    BatteryStorage (Duration 1h)GSES 1 LIMITEDTS22
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    0.20 MW
    Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG.(7 components)

    Battery Storage Plant (3)

    BatteryStorage (Duration 1h)Storage (Duration 2h)MELKSHAM WEST STORAGE LIMITEDSN12
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    8.56 MW
    Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG(7 components)

    Battery Storage Plant (3)

    BatteryStorage (Duration 1h)Storage (Duration 2h)MELKSHAM EAST STORAGE LIMITEDSN12
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    8.56 MW
    Levitt Hagg Landfill Site, Warmsworth, Doncaster, South Yorkshire, DN4 9RS(2 components)

    Battery Storage Station

    BatteryStorage (Duration 1h)Storage (Duration 1.5h)ALKANE ENERGY UK LIMITEDDN4
    Active • 2025-26 (T-4)
    Lebanon Farm, Lower Dunton Road, Dunton, Brentwood, RM14 3TD(1 component)

    40MW/40MWh BESS

    BatteryStorage (Duration 1h)BLUESTONE ENERGY LTDRM14
    Active • 2026-27 (T-4)
    4.72 MW
    Leafield Battery Site, Monks Lane, Corsham SN13 9PH(4 components)

    electricity storage site comprising brand new batteries, inverters and associated connection plant (2)

    BatteryStorage (Duration 1h)Storage (Duration 2h)LEAFIELD ENERGY LIMITEDSN13
    Active • 2026-27 (T-4), 2025-26 (T-4)
    7.09 MW
    Lascar Works, Tanpits Road, Bury, BL9 5BY(8 components)

    Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating … (3)

    BatteryStorageStorage (Duration 1h)GSES 1 LIMITEDBL9
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    4.10 MW
    Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP(7 components)

    Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

    BatteryStorage (Duration 1h)GSES 1 LIMITEDHR1
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    3.94 MW
    Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX(4 components)
    • Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
    • Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
    BatteryStorage (Duration 1h)Muirhall Energy LimitedEH48
    Active • 2025-26 (T-4), 2022-23 (T-4) ...
    Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST(4 components)

    Battery storage 40.000MW/40.000MWh one duration battery new build (3)

    BatteryStorage (Duration 1h)CARE POWER (BARNSLEY) LIMITEDS70
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH(8 components)
    • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
    • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
    • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
    BatteryStorage (Duration 1h)Storage (Duration 2h)Storage (Duration 1.5h)EQUINOR WELKIN MILL LIMITEDSK6
    Active • 2025-26 (T-4), 2024-25 (T-4) ...
    Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS(13 components)
    • 17.315 MW installed capacity Battery Storage facility (2)
    • 17.615 MW installed capacity Battery Storage facility
    DSRBatteryStorage (Duration 1h)SUSI EELPOWER ROCK FARM LIMITEDSY8
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    5.09 MW
    Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB(6 components)
    • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
    • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
    BatteryStorage (Duration 1h)Storage (Duration 9h)PIVOTED POWER LLPME10
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    12.22 MW
    Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE(16 components)

    4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (3)

    BatteryStorage (Duration 1h)Zenobe Capenhurst LimitedCH1
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD(4 components)

    Standalone Battery Storage Asset (3)

    BatteryStorage (Duration 1h)Storage (Duration 2h)Storage (Duration 1.5h)NATIVE RIVER LTDCH66
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    25.61 MW
    LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT).(5 components)

    Battery Storage Plant (3)

    BatteryStorageStorage (Duration 1h)Storage (Duration 2h)WEST DIDSBURY STORAGE LIMITEDM33
    Active • 2024-25 (T-4), 2023-24 (T-4) ...
    LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU.(7 components)

    Battery Storage Plant (3)

    BatteryStorage (Duration 1h)Storage (Duration 2h)WEST DIDSBURY STORAGE LIMITEDM33
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    8.56 MW
    LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR(12 components)

    Battery Storage Plant (3)

    BatteryStorageStorage (Duration 1h)Storage (Duration 2h)Storage (Duration 4h)ENDERBY STORAGE LIMITEDLE19
    Active • 2025-26 (T-4), 2024-25 (T-4) ...
    8.56 MW
    Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB.(9 components)
    • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (2)
    • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
    BatteryStorageStorage (Duration 1h)RNA-Energy LtdME2
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    4.55 MW
    Land off Stoke Lane, Norwich, NR14 8QD(3 components)
    • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
    • Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
    BatteryStorage (Duration 1h)Storage (Duration 2h)FPC ELECTRIC LAND LIMITEDNR14
    Active • 2027-28 (T-4), 2025-26 (T-4)
    10.77 MW
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access