Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

225 unique locations (1787 components) - Page 4 of 9

Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Inactive •
41.79 MW
Johnson Street, Leigh, M46 0RB (5 components)
Not Prequalified
Inactive •
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component)
Not Prequalified
Inactive •
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Inactive •
15.21 MW
Land at Burnley Road Simonstone BB12 7ND (16 components)
Rejected
Inactive •
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)

CMU comprising of battery storage and associated plant

Inactive •
50.46 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (6 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Inactive •
3.62 MW
Loading map...
Showing 25 locations