Storage (Duration 1h)

141 unique locations (1208 components) - Page 3 of 6

HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (17 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
66.82 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (2 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2028-29 (T-4)
0.11 MW
Ipswich Road, Cardiff, CF23 9AQ (8 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.79 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (11 components)

10MW of Battery Energy Storage Systems to be built.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.12 MW
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (7 components)

1.200 MW battery storage

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.62 MW
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component)

50MW/50MWh BESS

Active • 2026-27 (T-4)
5.91 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (20 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
15.21 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
47.60 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (17 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (4 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Active • 2028-29 (T-4), 2025-26 (T-1)
3.62 MW
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (6 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.26 MW
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (8 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.54 MW
Land at Traston Road, Newport, NP19 4PW (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Active • 2025-26 (T-4)
3.99 MW
Land at Weirs Drove, Cambridge, CB25 0BP (9 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.03 MW
Land at West Road, Trafford Park, M41 7SW (8 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.35 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.26 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (8 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.10 MW
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (3 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration

Active • 2025-26 (T-4), 2024-25 (T-1)
11.32 MW
Land North of Clayhill Farm, Westoning MK45 5JD (7 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.30 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (11 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.28 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (7 components)

New build storage facility

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (2 components)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Active • 2026-27 (T-4)
7.09 MW
Loading map...
Showing 25 locations