Storage (Duration 1h)
141 unique locations (1208 components) - Page 3 of 6
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (17 components)
Hungerford Farm, Winchfield, Hook, RG27 8SW (2 components)
Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …
Ipswich Road, Cardiff, CF23 9AQ (8 components)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (11 components)
10MW of Battery Energy Storage Systems to be built.
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (7 components)
1.200 MW battery storage
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (20 components)
Land At Brook Farm, Off Church Hill Road, North Of Burstall (in Close Proximity To The Bramford Substation Off Bullen Lane), Ipswich Nearest IP8 4LB (10 components)
battery storage asset 49.900MW/49.900MWh
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (13 components)
Battery Storage Plant
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (17 components)
CMU comprising of battery storage and associated plant
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (4 components)
7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (6 components)
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (8 components)
The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
Land at Traston Road, Newport, NP19 4PW (1 component)
Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport
Land at Weirs Drove, Cambridge, CB25 0BP (9 components)
Land at West Road, Trafford Park, M41 7SW (8 components)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (8 components)
New build battery storage 50.000MW/50.000MWh one hour duration asset
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (3 components)
new build battery storage asset 49.900MW/49.900MWh one hour duration
Land North of Clayhill Farm, Westoning MK45 5JD (7 components)
Land North of Clayhill Farm, Westoning, MK45 5JD (11 components)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (7 components)
New build storage facility
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (2 components)
30MW/30MWh one hour battery storage asset located near BURWB1 asset