Storage (Duration 1h)
220 unique locations (1115 components) - Page 2 of 9
The Common, Malmesbury, SN16 9RJ (2 components)
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (3 components)
A new battery storage plant, with associated civil works, switchgear and electrical connection. (2)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (8 components)
Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)
49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing (2)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (2 components)
6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt (2)
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)
1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (2 components)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
5MW, 1 hour/5MWh lithium-ion battery (3)
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)
Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
SEC, Stobcross Road, Scottish Event Campus, Stobcross, Glasgow, G3 8DG (2 components)
60MW / 60MWh BESS
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)
The CMU component will have a connection capacity of 2.5MW. BYD Battery
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (5 components)
1.500MW Battery Energy Storage System (3)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 component)
A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park
Royle Barn Road, Rochdale, OL11 3DX (5 components)
Battery Energy Storage Site (2)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)
Front of the Meter battery storage asset located in Devon. (3)
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)
Battery Storage Station