19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
3.53 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.08 MW
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System (2)
• A New Build 2.5MW Generation Battery Site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.14 MW
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Arreton Valley Nusery, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR (1 component)

The CMU component will have a connection capacity of 2.52MW. BYD Battery

Active • 2027-28 (T-4)
0.20 MW
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.42 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
Active • 2025-26 (T-4)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm (2)
• Solar farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive • 2023-24 (T-4)
Loading map...
Showing 25 locations