Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

11 unique locations (183 components)

Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
β€’ 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ EV charging at residential premises
β€’ Generating Unit 2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
52.05 MW
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (21 components)
β€’ Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
β€’ Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
β€’ Newbuild gas generator
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
826.58 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
β€’ CHP engine in a horticultural environment, natural gas, no aux load
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (5 components)
β€’ 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
β€’ Component has yet to be procured.
β€’ Load reduction upon instruction
Inactive β€’ 2022-23 (T-4), 2022-23 (T-3) ...
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
β€’ BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
β€’ CMU comprising of battery storage and associated plant
β€’ New build power station comprised of multiple reciprocating engines.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
J3 Business Park Balby Carr End Doncaster DN4 8DE (4 components)
β€’ 10 MW Storage facility
β€’ 10 MW Storage facility located at Balby, Doncaster.
β€’ Gas and/or diesel reciprocating engines.
Inactive β€’ 2020-21 (T-4), 2019-20 (T-1) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (9 components)
β€’ 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
β€’ 6 x reciprocating engines
β€’ A Battery Energy Storage System.
Active β€’ 2025-26 (T-4), 2023-24 (T-4) ...
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
β€’ Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
β€’ Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
β€’ Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
β€’ 1 MW CHP generation
β€’ 30MW/30MWh one hour battery storage asset located near BURWB1 asset
β€’ Siemens SGT200 based CHP
Active β€’ 2026-27 (T-4), 2024-25 (T-4) ...
5.34 MW
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
β€’ Load curtailment from refridgeration
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ battery energy storage system
Active β€’ 2028-29 (T-4), 2024-25 (T-1) ...
19.70 MW
Loading map...
Showing 11 locations