Storage (Duration 1h)

9 unique locations (174 components)

ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
β€’ Load curtailment from refridgeration
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ battery energy storage system
Active β€’ 2028-29 (T-4), 2024-25 (T-1) ...
19.70 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
β€’ 1 MW CHP generation
β€’ 30MW/30MWh one hour battery storage asset located near BURWB1 asset
β€’ Siemens SGT200 based CHP
Active β€’ 2026-27 (T-4), 2024-25 (T-4) ...
5.34 MW
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
β€’ Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
β€’ Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
β€’ Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW
Greenfield Road, Westoning, Bedford, MK45 5JD (9 components)
β€’ 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
β€’ 6 x reciprocating engines
β€’ A Battery Energy Storage System.
Active β€’ 2025-26 (T-4), 2023-24 (T-4) ...
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
β€’ BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
β€’ CMU comprising of battery storage and associated plant
β€’ New build power station comprised of multiple reciprocating engines.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
β€’ CHP engine in a horticultural environment, natural gas, no aux load
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active β€’ 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (21 components)
β€’ Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
β€’ Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
β€’ Newbuild gas generator
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
826.58 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
β€’ 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ EV charging at residential premises
β€’ Generating Unit 2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
52.05 MW
Loading map...
Showing 9 locations