Storage (Duration 1h)

1 unique locations (2 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land at Traston Road, Newport NP19 4PW (2 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport
β€’ The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Storage (Duration 1h) EL ASSET CO. 1 LIMITED New Build Generating CMU Traston Road Conditional NP19
Active β€’ 2025-26 (T-4), 2022-23 (T-4)
Loading map...
Showing 1 locations