Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

2 unique locations (129 components)

Brook Farm Gas, Brook Farm, Bicester, Oxfordshire, OX25 1NX (4 components)
• A Battery Energy Storage System, which has already PQ'd as POTM25
• Gas fired reciprocating engines
Active • 2024-25 (T-1), 2017-18 (T-1)
5.56 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW
Loading map...
Showing 2 locations