Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

3 unique locations (18 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land at Claredown Farm, Hickford Hill, Belchamp St Paul, Sudbury, Essex, CO10 7DW (6 components)
• 20 MW of DSR
• 20MW Battery Storage Facility located in Sudbury, Essex.
• 3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (6 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
DSR Storage Storage (Duration 1h) BESS Claredown Limited New Build Generating CMU Claredown DSRCL1 CO10
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 3 locations