Storage (Duration 1h)

9 unique locations (61 components)

Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.74 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (5 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2021-22 (T-1) ...
0.50 MW
J3 Business Park Balby Carr End Doncaster DN4 8DE (4 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (2 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 9 locations