Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

5 unique locations (34 components)

STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (3 components)

Storage facility

Inactive • 2022-23 (T-1)
Potmans Lane, Battle, TN33 9BL (8 components)

A Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Potman's Lane, Battle, TN33 9BL (7 components)
• A Battery Energy Storage System
• A Battery Energy Storage System, which has already PQ'd as POTM25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.23 MW
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Back Lane, Chesterfield, S44 5XQ (12 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.44 MW
Loading map...
Showing 5 locations