Storage (Duration 1h)

15 unique locations (194 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (14 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2029-30 (T-4), 2026-27 (T-4) ...
10.10 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4.67 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (6 components)

Front of the Meter battery storage asset located in Devon.

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2.17 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (5 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (14 components)
• 15.310 MW installed capacity Battery Storage facility
• 17.315 MW installed capacity Battery Storage facility
• 17.615 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.02 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)
• Battery Project on Greenfield Site
• Battery Project on greenfield site
• Battery Storage site at greenfield project.
• ... and 2 more unique descriptions
Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.32 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (6 components)
• Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2029-30 (T-4), 2027-28 (T-4) ...
18.41 MW
Land Adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (12 components)
• New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.85 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (5 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) GRENDON LAKES STORAGE LIMITED New Build Generating CMU Grendon Lakes Storage Limited Grendon Lakes Storage Limited +2 more NN7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
31.19 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire, FK15 9RA (5 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Dairy Lane, Westhamnett, Chichester, PO20 2BG (8 components)

4MW battery co-located with a solar farm

Storage (Duration 1h) E.ON UK PLC NPCM-13 NPCM-13 +4 more PO20
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1.53 MW
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.55 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (2 components)
• 1hr duration lithium-ion battery energy storage system.
• Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been declared as being 10.000MW instead of the distribution connection agreement capacity of 16.000MW for the purposes of calculating extended performance. The connection capacity of 10.000MW is a conservative estimate for the available battery capacity at the end of the CM delivery year 2028/29, using engineering judgement to take into account projected battery degradation and system performance at that time.
Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2029-30 (T-4), 2028-29 (T-4)
2.09 MW
Loading map...
Showing 15 locations