Storage (Duration 1h)
20 unique locations (182 components)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (3 components)
Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)
Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (3 components)
Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the …
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
Dairy Lane Westhamnett Chichester PO20 2BG (8 components)
4MW battery co-located with a solar farm
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)
Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)
Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …
Ipswich Road, Cardiff, CF23 9AQ (10 components)
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
CMU comprising of battery storage and associated plant
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (6 components)
7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.
Land North of Clayhill Farm, Westoning MK45 5JD (8 components)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (17 components)
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)
Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (2 components)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (2 components)
Front of the Meter battery storage asset located in Devon.