Storage (Duration 1h)

2 unique locations (41 components)

Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (34 components)
• A Battery Energy Storage System.
• Combined Heat and Power Plant Olympic Park London
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (7 components)
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• New Build Battery Energy Storage Systems
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2028-29 (T-4), 2024-25 (T-1) ...
8.79 MW
Loading map...
Showing 2 locations