Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

43 unique locations (576 components) - Page 1 of 2

Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (6 components)
• 3 x 2MW gas gen sets
• Battery Storage Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.19 MW
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (4 components)

1.200MW BESS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.37 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.74 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (15 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.02 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (6 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
89.24 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.32 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.26 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (17 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.72 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.50 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (20 components)
• 17.315 MW installed capacity Battery Storage facility
• 17.615 MW installed capacity Battery Storage facility
• 19.6 MW Battery Storage facility
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.76 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
77.39 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Active • 2027-28 (T-4), 2025-26 (T-4)
10.77 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (9 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.11 MW
Land North of Clayhill Farm, Westoning MK45 5JD (6 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.25 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.38 MW
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.10 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (14 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.44 MW
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (4 components)

1.200 MW battery storage

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.37 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.26 MW
Loading map...
Showing 25 locations