Storage (Duration 1h)

99 unique locations (607 components) - Page 1 of 4

35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
3.53 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.08 MW
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)

45MW/45MWh BESS

Active • 2026-27 (T-4)
5.32 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.42 MW
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component)

60MW/60MWh BESS

Active • 2026-27 (T-4)
7.09 MW
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Active • 2026-27 (T-4)
53.16 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.87 MW
Carlton, Stockton-on-Tees, TS21 1EA (9 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Cedar Cottages, Lower Dunton Road, Bulphan, Upminster, RM14 3TD (1 component)

28MW/28MWh BESS

Active • 2026-27 (T-4)
3.31 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
11.74 MW
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
3.54 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW