Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

89 unique locations (474 components) - Page 1 of 4

Active MW: 0.00 MW
Inactive MW: 0.00 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.65 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.35 MW
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)

45MW/45MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU AIRDRIE Not Prequalified ML5
Active • 2026-27 (T-4)
5.32 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.74 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• 5.2MW of batteries across several sites
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 AGABS3 +3 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component)

60MW/60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU BONNYBRIDGE Not Prequalified FK5
Active • 2026-27 (T-4)
7.09 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.11 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (10 components)
• 0.800MW of battery storage located at Wiltshire.
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
• 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
DSR Storage (Duration 1h) LIMEJUMP LTD Unproven DSR CMU ABS1 BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2025-26 (T-4) ...
23.81 MW
Carlton,Stockton-On-Tees,TS21 1EA (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
DSR Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU Rejected TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Cedar Cottages, Lower Dunton Road, Bulphan, Upminster, RM14 3TD (1 component)

28MW/28MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU CEDAR COTTAGES Not Prequalified RM14
Active • 2026-27 (T-4)
3.31 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT (1 component)

99.4MW / 99.4MWh BESS

Storage (Duration 1h) OCKER HILL BESS LIMITED New Build Generating CMU OCKER HILL DY4
Active • 2026-27 (T-4)
11.74 MW
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
3.54 MW
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)

49MW/49MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU DOUGLIEHILL Not Prequalified PA15
Active • 2026-27 (T-4)
5.79 MW
Drayton Manor Farm, Alcester Road, Stratford-upon-Avon, CV37 9RG (10 components)
• 0.400MW of battery storage located at Stratford-Upon-Avon.
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• 1 x 1MW / 1.2 MWh BYD Lithium Ion Battery: at Drayton Manor Farm,Alcester Road,Stratford-upon-Avon,CV37 9RG
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4), 2025-26 (T-4)
1.18 MW
East to Sundon NG Substation, Chalton, Luton, LU4 9UQ (1 component)

30.000 MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Loading map...
Showing 25 locations