Storage (Duration 1h)

107 unique locations (474 components) - Page 1 of 5

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Yalberton Rejected TQ4
Active • 2025-26 (T-4)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Storage Storage (Duration 1h) GHEB2 C6 LIMITED New Build Generating CMU Whitehouse Farm Whitehouse Farm +3 more WR13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT05 BATT05 LE12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.98 MW
Welkin Road, Portwood, Stockport, SK6 2BH (1 component)

Battery Energy Storage System

Storage (Duration 1h) AVE 002 LIMITED New Build Generating CMU Welkin Road Not Prequalified SK6
Active • 2025-26 (T-4)
Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Welbeck Storage Welbeck Storage Not Prequalified WF6
Active • 2025-26 (T-4)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Storage (Duration 1h) WP GRID STORAGE 1 LIMITED New Build Generating CMU WP BESS 1 Not Prequalified NP19
Active • 2025-26 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Active • 2025-26 (T-4), 2024-25 (T-1)
2.38 MW
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Storage (Duration 1h) TILN CONNECTIONS LTD New Build Generating CMU Tiln Storage Facility DN22
Active • 2025-26 (T-4)
Tickhill Road, Maltby, S66 7QR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Maltby Rejected S66
Active • 2025-26 (T-4)
Thrybergh Weir, Kilnhurst, Mexborough, South Yorkshire, S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS (2)
• BATTERY ENERGY STORAGE SYSTEM
Storage (Duration 1h) FAREHAM ENERGY RESERVE LIMITED Existing Generating CMU FAR123 FAR123 PO14
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.84 MW
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing (2)

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU INVERKEITHING INVERKEITHING KY11
Active • 2026-27 (T-4), 2025-26 (T-4)
5.89 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Storage (Duration 1h) ERSKINE ENERGY STORAGE LIMITED Erskine Erskine Energy Storage Conditional PA7
Active • 2025-26 (T-4), 2022-23 (T-4)
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (4 components)

1.500MW Battery Energy Storage System

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT001 GL2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Storage Storage (Duration 1h) GHEB2 C2 Limited CONRAD (WINCHESTER) LIMITED New Build Generating CMU Russell Farm Russell Farm +3 more SO21
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royle Farm, Burton upon Trent, Derbyshire, DE15 9TU (2 components)
• A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park
• Containerised battery storage asset, 2 hour duration
Storage (Duration 1h) Storage (Duration 2h) ALUDRA BESS LTD New Build Generating CMU ALUDRA BESS LTD (Drakelow) DE15
Active • 2026-27 (T-4), 2025-26 (T-4)
21.27 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Rotherham Storage Rotherham Storage Not Prequalified S61
Active • 2025-26 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Gas turbine generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.55 MW
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System
• 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 NG2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Potman's Lane, Battle, TN33 9BL (11 components)
• A Battery Energy Storage System
• A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 Limited New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-4) ...
14.67 MW
Loading map...
Showing 25 locations